So if you recall my post a while back showing my floors covered in writing, the house is currently being remodeled. I am currently sick and tired of this project and I have no idea why it was believed to be a good idea in the first place...

There was a wall taken out... No big deal, no problems found. Holes in the connecting wall and celling have been patched. Texture and paint applied.
-Time to complete: 3 weeks

All new can lights put in. A dozen of them spaced out over two rooms (so six per). Holes cut, problem found... Holes patched, new diagram for lights drawn, new holes cut, no new problems found. Lights installed and wired up. Dimmer switches installed.
-Time to complete: 2 weeks (thanks to problem #1)

LCD TV wall mount installed and HDMI cable installed in wall to make connecting TV easier. Bracket up, holes cut, problem found... Holes patched, bracket moved, new holes cut, no new problems found. The TV is on the wall and good to go.
-Time to complete: 1 week (thanks to problem #2, should have been 1 day)

Carpet and linoleum removed, new hardwoods installed. Got the carpet out, the linoleum removed, and even the sub-floor taken out. The hardwood is here... Except a couple of pieces that I kinda need, and the slate tile for the entryway. Problem created out of thin air... Supplier can't deliver on time.
-Time to complete: IN PROGRESS


This project is now past two months and I am dying here. I have no idea why in the hell I thought that this was a cool idea in the first place. I just see a torn up house with a kitchen that I can't really use. A place that I pay to live at, but have no desire to be in at all right now. Seriously lame...